Before the Road Paver Machine job, you should do a series of checks to make sure there is no problem to work, then what kind of technical requirements do you need for the Road Paver Machine to run? Let's take a look:
(1) According to the construction requirements, determine the working speed, paving width, paving thickness, scraper conveyor and screw feeder speed, bucket opening and other parameters of Road Paver Machine.
(2) Mechanically driven asphalt mixture Road Paver Machine, shifting must be carried out when the Road Paver Machine is completely stopped, and strong gearing is strictly prohibited.
(6) During the transition of Road Paver Machine, it is forbidden to shift gears on the ramp or slide downhill in neutral. 20-40min before the paving operation, the screed is preheated to be close to the paving temperature of the asphalt mixture; therefore, when the operation is suspended, the preheating system is used for heat preservation to prevent the screed from cooling; when preheating with electricity, Start the engine first.