Specific Requirements For Transporting Running Track Paver Machine

When using the Running Track Paver Machine, you need to clean the equipment. Also pay attention to check the parts. When using the transporter to transport the Running Track Paver Machine, the specific requirements are as follows:

First, when climbing the ladder on the Running Track Paver Machine, the rear ironing device and the auger piece should not be scraped to prevent the post-ironing device and the cylinder piston from being deformed.

Second, the ironing device of the Running Track Paver Machine is placed in the middle of the transport pallet, and it is also padded with wooden boards to prevent the steel parts from slipping between them. The brackets are positioned around the pallets with iron piles.

Third, fix the Running Track Paver Machine on the pallet truck, and turn off the main power switch, longitudinal slope, cross slope and hand controller, etc., and keep it in a special box and put it on the pallet. Transport inside the car driving building.