1, Paver Machine should always check the working condition of the vibrating rod. It was found that pitting or cracking occurred many times in the cross section on the road surface, indicating that there was a problem with the vibrating bar at the place. It was necessary to stop the inspection or replace the vibrating bar at the place. After paving, it was found that there was left on the road surface. The polished strip of the Paver Machine vibrating rod indicates that the vibrating rod is too deep and must be adjusted to the correct position until the bottom edge of the vibrating rod is above the height of the trailing edge of the extruded bottom plate.
2. When paving the double-lane road with a width of 8m or more, if the rubber materials with different consistency of the two vehicles are unloaded left and right, the Paver Machine paving speed should be set according to the dry side, and it should be thinner. The frequency of the vibrating bar on the side is rapidly reduced.
3. When the rubber material is not supplied, or the mechanical failure of the mixing building occurs, the downtime shall not exceed 2/3 of the initial setting time of the rubber material at that time. After this time, Paver Machine shall be opened. Paving the work surface and making construction joints. When there is a mechanical failure in Paver Machine, the building should be stopped after emergency notification. In the downtime, the rubber material in Paver Machine has not yet been initially set. It can eliminate the fault and allow the paving to continue. Otherwise, Paver Machine should be dragged as soon as possible. Paving the work surface. After troubleshooting, restart the paving.