1. After the paving of the plastic track is completed, it can be used after 7-10 days of maintenance.
2. The plastic runway is suitable for all-weather use under the condition of certain drainage equipment. The plastic track is used for sports exercises, competitions and students' static and fitness exercises, and is not suitable for other purposes.
3. Prevent the purification of harmful materials, keep them clean, prevent violent mechanical impacts and frictions, prohibit vehicles from driving on the track, pile up heavy objects and sharp objects, etc. (except standard running shoes). Special nail shoes must be worn for sports. The nail length does not exceed 7 mm, and jumping shoes does not exceed 11 mm. If the nail shoes have longer nails, they are not allowed to be used on the plastic track.
4. Prevent temporary load.
5. Prevent fireworks and isolate heat sources, prevent contact with organic solvents, chemicals, cigarette butts and other fires, purification materials, etc.
6. It should be cleaned with water spray frequently. After cleaning, a large amount of residual water on the rubber surface can be removed with a dry cloth. Use 10% ammonia water or detergent or washing powder to wipe off oily dirt.