1. In order to prevent the plastic track from getting wet, it is necessary to do a good job of waterproofing. There are certain conditions in the construction process of the plastic track project. For example, the surface temperature during construction should be within the range of 15 to 45 degrees, the weather should be sunny, fog-free, and relative humidity should be low. In order to ensure the quality of the entire plastic runway project, the construction personnel should follow these conditions during the construction process, so as not to achieve the expected results of the construction.
2. The plastic runway project should try to prevent water accumulation during the construction process, because the plastic runway is a polyurethane plastic material. After laying the plastic runway, there will be local blisters on the rubber surface. Because the density control of the plastic runway base layer is unreasonable, we need to strictly control the compactness of the plastic runway to prevent the asphalt base layer from being embedded and extruding. Layer phenomenon, the appearance of gasification of the plastic runway, and even primer pull in severe cases.
3. Therefore, construction workers must do a good job of waterproofing during the construction of the plastic runway construction project. During the construction period, they should be equipped with plastic sheets and listen to the weather forecast at any time. If there is sudden water construction, immediately stop covering the plastic surface to ensure that there is no quality problem. Once the rubber track enters water during the initial maintenance, bubbles will be generated, which will affect the laying quality of the plastic track. In addition to rain protection, the sweat of the construction workers will also affect the solidification of the plastic glue on the runway.
4. The construction personnel of the plastic runway should prepare wipe towels in advance when laying work in a high temperature environment. The paving time should try to avoid the time when the air and ground humidity are too high in the morning. During the construction process, the construction personnel shall arrange all procedures strictly and reasonably to ensure the reliable quality of the project.