The Road Paver Machine is a type of construction equipment primarily utilized for the placement of different materials on both the base and surface layers of highways. The paving process is achieved through the utilization of various distinct systems, such as the travel system, hydraulic system, material delivery system, among others.
These are a set of guidelines for operating and maintaining a Paver Machine. Here's a summary of the points mentioned:
1. The operator must be professionally trained, understand the machine's performance and structure, and be qualified by relevant departments before operating the machine alone.
2. Before starting the engine, check the oil levels, belt tension, and look for any oil leakage or loose parts. Ensure all necessary fittings, accessories, and tools are available for the day's work.
3. After starting the engine, let it idle for at least two minutes and check if the monitoring system instructions are normal.
4. Someone should direct the unloading of material from the vehicle and accurately unload it into the machine's hopper.
5. Prior to working, the Paver Machine operator must communicate with the leveling personnel to ensure no one else is in the operation area.
6. When switching from working gear to traveling gear, do so under small throttle, after the machine is stopped and the working parts have stopped moving.
7. Operators must not operate the equipment under the influence of alcohol, wear neat attire, avoid wearing slippers, and refrain from smoking, eating, drinking, or engaging in any behavior that compromises safety.
8. After finishing work, all guards must be properly installed in their designated positions.
9. Keep the operation room/platform clean, promptly clean up oil and other dirt, and avoid placing tools and other items in a disorderly manner.
10. Before leaving the operating platform, ensure all operating mechanisms are in the "0" position.
11. When the hydraulic automatic widening Running Track Paver Machine is widening, pay attention to the surroundings to avoid injury or equipment damage.
12. When heating paving with a liquefied gas tank, close the tank valve after extinguishing the fire or misfire. If the ambient temperature exceeds 200C or when using a gas tank under direct sunlight, the gas tank must be covered.
13. After finishing paving, clean the material transport and tamping device. The screed must be placed on the mat. Park the machine appropriately without obstructing traffic, and place warning signs. Idle the engine for 5 minutes before switching it off, then cut off the power supply and lock the dashboard.