Before the paver machine works formally, it is often necessary to carry out trial paving on the road surface. The purpose of this is to adjust the working state of the road paver machine and check whether the whole paver meets the normal working state. Now, follow my steps to see what are the key points of the rubber paving machine's trial paving.

(1) The whole road paver machine runs without load, and check whether all working mechanisms of the paver work normally.

(2) Road paver machine the stabilized layer test section and complete the determination of paving parameters.

Determination of paving speed: the speed of the rubber paving machine paving the stabilized layer shall be determined by matching the production capacity of the stabilized soil mixing station, the transportation capacity of the transport vehicles, and the paving width and thickness. The best working speed of asphalt concrete paver is generally 2 m/min when paving the stabilized layer.

What Are The Precautions For Trial Paving Of Paver Machine

Determination of vibrating parameters of road paver machine: the vibrating parameters of paver are adjusted through the pressure gauge display of the paver's vibrating hydraulic system. In order to ensure the flatness of the stabilized layer, the pressure of the paver's vibrating hydraulic system should be increased, but the accessories of the paver should not produce severe vibration. As for the stable layer paved by road paver machine, according to experience, the rammer pressure is 6 MPa, and the vibrating beam pressure is 8 MPa.

Determination of loose square coefficient of initial paving of rubber paving machine: the loose square coefficient (compaction coefficient) of paving varies according to different stable material gradations. Under the same paving conditions, the larger the aggregate content, the smaller the selection coefficient; On the contrary, the larger the selection coefficient is. When paving the test section, the initial paving coefficient is generally about 1.1~1.2, or selected according to experience.

Select initial paving elevation α: Before determining the paving elevation, it is necessary to measure the initial installation of the screed. That is, the paver and screed are placed on the horizontal ground, and the elevation scale on both sides is indicated at 0 or 5 (generally, the factory adjustment value of the initial elevation of the paver is 5. At this time, measure and adjust the screed of the paver to the horizontal position.

Determination of vehicles for transporting rubber paving machine: generally speaking, the paving capacity of pavers is often higher than the production capacity of mixing stations. Therefore, when determining the number of transportation vehicles, it is determined by referring to the production capacity and transportation distance of mixing stations.