How To Operate The Running Track Paver Machine

Running Track Paver Machine Please turn on the reset switch before operation.

The left and right conveyor belts can only be operated while paving, and the console is equipped with two switches that drive the clinker strips on the left and right sides. These switches can be set in 3 different positions.

Position 0: The clinker belt is at rest.

Position I: The conveyor belt is in the manual working state. The “open” and “stop” of the material will not be controlled by the main switch. The speed of the conveying is from the speed regulating valve on both sides of the fuselage. Adjustment. The switch position is adapted to the corresponding paving conditions.

Position II: The conveyor belt is in automatic working state. At this position, the speed of the conveyor belt is controlled by the ultrasonic sensor to control the “opening” and “stopping” of the conveying material, so as to ensure the feeding. The amount of paving material in the tank. "Automatic" position, the "open" and "stop" of the conveyor belt can be controlled by the main switch.

How To Operate The Running Track Paver Machine