Shandong China Coal
Rubber Paver Equipment Co., Ltd.

homeHome>information

How To Maintain The New Plastic Runway

1. The paving of the plastic track is completed, and it can be applied within 7-10 days after maintenance;

2. The plastic track is integrated into all-day applications under the standard of having no doubt drainage pipe equipment. The plastic track is used for fitness training, competitions, students' motionlessness and exercise training, and discomfort is used for other purposes;

3. Avoid the cleanliness of the supply of hazardous materials, keep it tidy and avoid strong mechanical equipment impact and friction. It is forbidden to drive cars, pile up hanging objects and sharp objects (except standard sports shoes) on the sports field. You must wear professional nail shoes for fitness exercises. The nail length of the shoes does not exceed 7 mm, and the high jump shoes do not exceed 7 mm. If the nail shoes contain longer steel nails, they cannot be used on the plastic track;

4. Avoid temporary loads;

5. Avoid fireworks and pyrogens, avoid touching solvents, chemicals, cigarette butts, other fires, cleaning materials, etc.;

6. It should be cleaned by spraying with tap water frequently. After cleaning, a large amount of residual water on the rubber surface can be removed with a damp cloth. Oil stains can be cleaned with 10% sodium hydroxide or detergent or soap powder.